Visit us at 287 Munster Road, Fulham, London SW6 6BWdesign | install | 0207 386 0000 · WhatsApp
Complete bathrooms

Bathroom renovations planned around the real room.

From full rip-out and redesign to shower rooms and bath-to-shower conversions, we combine the finish you want with the practical installation details behind it.

Complete bathrooms

What the service can include

The exact specification is agreed after the property and project have been assessed.

Included

Full bathroom renovation

Rip-out, preparation, first-fix plumbing, waterproofing, tiling, fitting and finishing managed as one project.

Included

Shower rooms

Walk-in and enclosed shower rooms planned around drainage, floor levels, screen sizes and water pressure.

Included

Bath-to-shower conversions

Replace an underused bath with a practical shower layout without making the room feel improvised.

Included

Layout improvements

Reconsider door swings, storage, sanitaryware, heating and access to make better use of the existing footprint.

Bathroom renovations planned around the real room.

Planned properly

Before the work starts, we check the details that shape the result.

A good-looking proposal is only useful when it works with the actual room, existing services, access and property constraints.

Measured room and layout planning
Water pressure, hot water and drainage checks
Preparation, waterproofing and tiling specification
Product and finish guidance
Managed installation and final checks

Questions

Frequently asked questions

How much does a full bathroom renovation cost in London?+

Costs vary with room size, access, specification and hidden preparation. Many complete London bathrooms sit from roughly £9,000 upwards, while more involved or premium projects can be substantially higher. A survey is needed for a real quotation.

Can you work with products I have chosen?+

Yes. We can review products you have found and check dimensions, compatibility, delivery and installation requirements before they are ordered.

How long does a bathroom renovation take?+

Many standard projects take around two to three working weeks, but structural work, drying times, specialist products and access can extend the programme.

Start with a free home survey

Tell us what you are considering. We will look at the room, the practical installation route and the finish you want before preparing a realistic proposal.

Call WhatsApp